    UPDATE:

    I have 11 kits coming together. They are mostly done except for completing the final assembly of the SSPB. The potting material needs to harden and then a coat of conformal coating over that and they are ready to go.

    For those of you that have not ordered yet, there was about an additional 1 month delay while I had the PCB's made for the third time by Silver Circuits and one time by Advanced Circuits. All of the boards currently assembled are from Advanced circuits and I have plenty of bare PCB's.

    It has been a challenge (i.e. a lot of work) to do a semi custom production run but it has worked out well and I think everybody that ordered one will be happy with the SSPB.

    I will probably ship these on Wed as I have other responsibilities tomorrow and I just put the potting material in tonite (it takes 24-48 hours to set).

    Close ups of the prototype enclosures with the three base options Horizontal, Diagonal and Tabless. (PCBA is not installed)




    Based on the current orders I built mostly the tabless , with diagonal coming next. I built the fewest of the horizontal (only 2 left)




    16 partially assembled PCB's of the Rev C (NO RED or GREEN Wires!!!)





    I may need to order a few more parts, but generally I'm ready to produce some more if I can get at least a lot of 5 more. This was 11 complete units which takes about 60 hours to assemble. I'm hoping that will drop as I get better having gone through the process. I have more assembled boards but the case, heat sink and cables are basically semi custom options so I need specific orders to configure and bond the PCB to the base.

    Send me an email at

    solidstatepowerbox@gmail.com if you are interested in getting one.
    Last edited by posplayr; 01-21-2014, 01:49 PM.

    Comment

    • tkent02
      Forum LongTimer
      Past Site Supporter
      • Jan 2006
      • 35571
      • Near South Park

      #182
      Looks great! Are the tabless ones all sold?
      http://img.photobucket.com/albums/v5...tatesMap-1.jpg

      Life is too short to ride an L.

      Comment

      • posplayr
        Forum LongTimer
        GSResource Superstar
        Past Site Supporter
        • Dec 2007
        • 23673
        • Tucson Az

        #183
        Originally posted by tkent02
        Looks great! Are the tabless ones all sold?
        I have more tabless. 5 of the 11 orders are tabless so I made several more tabless cases based on that.

        Comment

        • Guest

          #184
          Thanks, Jim, for everything!! I await my tabless sspb and will install it asap!!

          Comment

          • Guest

            #185
            Jim,

            I'm currently building a custom based off a Yamaha XS650. I'm assuming I could adapt the SSPB for that platform as well correct?

            What about using all LED lighting. Is that a possibility?

            Thanks.

            Comment

            • posplayr
              Forum LongTimer
              GSResource Superstar
              Past Site Supporter
              • Dec 2007
              • 23673
              • Tucson Az

              #186
              Originally posted by Sci85
              Jim,

              I'm currently building a custom based off a Yamaha XS650. I'm assuming I could adapt the SSPB for that platform as well correct?

              What about using all LED lighting. Is that a possibility?

              Thanks.
              The SSPB should work with any bike or junction box that has 10 amps per channel with 15 amps max. It should go higher (20 and maybe 25 amps peak) but that is something I need to test.

              The LED's should be no problem. There are even LED displays.

              All it really needs is an ignition switch and kill switch. The headlamp cutout is optional (if you don't connect START then it will not kill the headlamp but it will come on with the IGN SW)as well as the Acc** output.
              The Acc** can be:
              • always off,
              • Switched with IGN
              • externally switched High side
              • externally switched Low side.


              I'll take some more pictures tomorrow after the conformal coating drys. That was the last step before refitting the cover.

              I expect to be sending out units tomorrow (including yours)

              If you have a schematic of what you plan to do I can take a look at it and offer recommendations as might be required.
              Last edited by posplayr; 01-15-2014, 12:42 AM.

              Comment

              • posplayr
                Forum LongTimer
                GSResource Superstar
                Past Site Supporter
                • Dec 2007
                • 23673
                • Tucson Az

                #187
                Originally posted by gsgeezer
                Thanks, Jim, for everything!! I await my tabless sspb and will install it asap!!
                Should be shipped USPS tomorrow; sorry about the PCB delays but now you are getting Rev C and I think you will like it.

                I have been testing all the units with no heat sink and they get a little warm when being shorted, but with the epoxy and heat sink there is much less heat rise doing similar tests. It is only 2-4 watts so just the wires coming out will dissipate a lot of heat even without the heat sink.
                Last edited by posplayr; 01-15-2014, 12:44 AM.

                Comment

                • posplayr
                  Forum LongTimer
                  GSResource Superstar
                  Past Site Supporter
                  • Dec 2007
                  • 23673
                  • Tucson Az

                  #188
                  All 9 units shipped USPS today and you all should get tracking info by email. (except greg78gs750 who wants a change in base and it will take another week).

                  More videos to come.

                  Comment

                  • Guest

                    #189
                    Great news. Things are still tight here after my move and remodeling, but I hope I can get an order in before the stampede.

                    Comment

                    • TooManyToys

                      #190
                      Jim,

                      Mine showed up in the mailbox today.

                      Comment

                      • Dogma
                        Forum Guru
                        • Sep 2007
                        • 7142
                        • Mason, OH (SW)

                        #191
                        Mine arrived too. I like the labels.

                        Dogma
                        --
                        O LORD, be gracious to me; heal me, for I have sinned against you! - David

                        Skeptical scrutiny is the means, in both science and religion, by which deep insights can be winnowed from deep nonsense. - Carl Sagan

                        --
                        '80 GS850 GLT
                        '80 GS1000 GT
                        '01 ZRX1200R

                        How to get a "What's New" feed without the Vortex, and without permanently quitting the Vortex

                        Comment

                        • posplayr
                          Forum LongTimer
                          GSResource Superstar
                          Past Site Supporter
                          • Dec 2007
                          • 23673
                          • Tucson Az

                          #192
                          Originally posted by Dogma
                          Mine arrived too. I like the labels.

                          Glad these things are arriving so fast. If you back the screws off about 1/4" then you can open the cover to see the jumpers.

                          I guess I better do another Youtube video.

                          Comment

                          • Guest

                            #193
                            Mine arrived as well Jim. This thing looks and feels beefy. I'm thinking I might use it on my current project bike and possibly buy another for the Suzi. When will you be ready for new orders?

                            Comment

                            • posplayr
                              Forum LongTimer
                              GSResource Superstar
                              Past Site Supporter
                              • Dec 2007
                              • 23673
                              • Tucson Az

                              #194
                              Originally posted by Sci85
                              Mine arrived as well Jim. This thing looks and feels beefy. I'm thinking I might use it on my current project bike and possibly buy another for the Suzi. When will you be ready for new orders?
                              ready now; I have plenty of bare boards now.
                              Last edited by posplayr; 01-17-2014, 10:27 PM.

                              Comment

                              • posplayr
                                Forum LongTimer
                                GSResource Superstar
                                Past Site Supporter
                                • Dec 2007
                                • 23673
                                • Tucson Az

                                #195
                                Status Update 1/17/2014

                                The first 10 units of the Solid State Power Box with the Rev C PCB's (no red wires) have been completed and delivered. See this video and an overview of the capability and installation.

                                Comment

                                Working...