I just recently bought a GS450L for $200 as a project bike and have been doing a lot of research on how to get started. I thankfully found this forum and have been reading through as many topics as I can to get an idea of the plan. I've previously fixed a Ninja 250 that wasn't running, but I think the effort it will take to get this running and to where I want doesn't compare.
Background:
- There really isn't much detail about the bike besides that it has been sitting for years. The PO wanted to start a rebuild but quickly realized they didn't have the experience and decided to let it go for cheap
- I haven't attempted to start it at all in fear of causing any potential damage before I get some feedback
- Visually it's in good shape (planning to upload a picture soon)
I'm continuing my research across the forum to get an idea of what I want to do, but I can use some advice on how to get started. My plan is to build this into either a brat or cafe racer, but I'm not entirely sure if I should:
- Strip it down first and work through the transformation piece by piece
- Focus on getting it to run before going any further
I was leaning towards stripping it down and start tackling the frame and work my way towards the carbs and engine once I'm ready to put things back together. If I go with that route, I was going to rebuild the carbs, check the valve clearances, and go through the service manual for recommended replacements/maintenance of the engine (spark plugs, etc.). Should I tear down the engine and clean it through since it's been sitting idle for so long? Is changing the oil and following the recommended service manual enough until I try to get it running? I've done valve clearances with my Ninja, but I haven't gone past that. I'm willing to put in the work if needed and am patient enough to learn if that's what is recommended.
Or should I focus on just the carbs and getting it to run first? Any advice on how to get started would be greatly appreciated!
Edited to add -
In the meantime I'm continuing to do research from other posts to add to my plan and parts lists. I just want to make sure I at least start working on this soon while I'm waiting for things to arrive.
Comment