M
midnightcafe
Guest
My project is finally going back together. the shop I'm restoring it in gave me a week deadline so I've been burning the midnight oil getting everything together.
Two tone engine paint with polished engine covers.
Engine laying on its side, ready to receive the frame. This would have been much easier if I removed the stuck tach cable (Also it's important to wrap all the frame bars that will contact the motor/table-I got some nicks on mine I'll have to touch up)
This is how far I've gotten after four days, a lot of work since I tore the bike down over a year ago and things don't like to piece back together after that period of time. POR chassis black paint came out great on the individual parts, not that good on the frame. I was showing fatigue after 10 hours of painting when I started the frame, it came out okay.
Two tone engine paint with polished engine covers.
Engine laying on its side, ready to receive the frame. This would have been much easier if I removed the stuck tach cable (Also it's important to wrap all the frame bars that will contact the motor/table-I got some nicks on mine I'll have to touch up)
This is how far I've gotten after four days, a lot of work since I tore the bike down over a year ago and things don't like to piece back together after that period of time. POR chassis black paint came out great on the individual parts, not that good on the frame. I was showing fatigue after 10 hours of painting when I started the frame, it came out okay.