J
JungleJustice
Guest
1) V & H 4-into-1s are on order. 
2) HD rear Progressives have shipped.
3) Fast from the Past fork-brace is on the way.
4) Wheels are in for powder-coating (flat-matte black - no polished edges)!
5) New Avon's are ready for mounting - just as soon as the wheels are back from powder-coating!
6) All colour-coded parts are in for paint (Dark metallic "Gun Metal" gray - base/clear...)!
Am I banned yet!?
7) New GS1000S clutch cable should be here tomorrow.
8) Ditto for the new air-box boots!
9) Cam-cover is off for valve-adjustment.
10) Brake-lines are removed and ready for duplication in stainless steel-braided!
2) HD rear Progressives have shipped.
3) Fast from the Past fork-brace is on the way.
4) Wheels are in for powder-coating (flat-matte black - no polished edges)!
5) New Avon's are ready for mounting - just as soon as the wheels are back from powder-coating!
6) All colour-coded parts are in for paint (Dark metallic "Gun Metal" gray - base/clear...)!
7) New GS1000S clutch cable should be here tomorrow.
8) Ditto for the new air-box boots!
9) Cam-cover is off for valve-adjustment.
10) Brake-lines are removed and ready for duplication in stainless steel-braided!
Last edited: