G
GSX1000E
Guest
As inferred earlier with the 77mm bore, I am using a different set of cylinders and cylinder head.
Today, I pulled the pistons out of the lacquer thinner and drove the 130+ miles round trip to a friend's mini-machine shop so that he can
mill most of the piston crown off of the 13:1 MTC pistons that I have for the bore and get them closer to 11:1.


He is also busy making me some custom steel clutch hub spacers to replace the weak/often worn sideways stock aluminum ones as seen here.
(I already have the 40mm grade 12.9 bolts to replace the weak/often bent 35mm factory clutch spring bolts.)

While at his shop, I helped myself to surfacing the cylinders.
I still need to finish hone the sleeves and paint/bake the cylinder with a second coat.

Back at home, I worked some more on surfacing those nasty rotors.
I just got an E-mail today that the fork seals and dust seals will not arrive until Thursday of next week.
Along with the new rubber grommets to secure the side covers. At least I already have the seals to rebuild the calipers.
I shall be working on the finishing touches to the rims and getting the tires mounted later this week.
I am hoping that this does not become some long drawn out 2-3 year thread like so many others.
I will be putting a fire under my butt to keep moving in the right direction to accomplish that goal.
Today, I pulled the pistons out of the lacquer thinner and drove the 130+ miles round trip to a friend's mini-machine shop so that he can
mill most of the piston crown off of the 13:1 MTC pistons that I have for the bore and get them closer to 11:1.


He is also busy making me some custom steel clutch hub spacers to replace the weak/often worn sideways stock aluminum ones as seen here.
(I already have the 40mm grade 12.9 bolts to replace the weak/often bent 35mm factory clutch spring bolts.)

While at his shop, I helped myself to surfacing the cylinders.
I still need to finish hone the sleeves and paint/bake the cylinder with a second coat.

Back at home, I worked some more on surfacing those nasty rotors.
I just got an E-mail today that the fork seals and dust seals will not arrive until Thursday of next week.
Along with the new rubber grommets to secure the side covers. At least I already have the seals to rebuild the calipers.
I shall be working on the finishing touches to the rims and getting the tires mounted later this week.
I am hoping that this does not become some long drawn out 2-3 year thread like so many others.
I will be putting a fire under my butt to keep moving in the right direction to accomplish that goal.
Last edited:



















